- Coal Plant to be sited at Silam, Lahad Datu
 - EIA NOT approved
 - State Assembly concerned about the potential harm it would bring to the community and to the nearby environmentally sensitive areas
 - Sabah scraps RM1.3b Silam power plant
 
Proposed Location 2 (2008) : Seguntor, Sandakan
- Coal plant to be sited in .........Sandakan (Sandakan community  fights back)
 - NO EIA was conducted
 - State Assembly rejects due to strong objection from the local community.
 
- PM announced new site to be located in Dent Peninsular, FELDA SAHABAT in Lahad Datu
 - awaiting EIA
 - CM STATEMENT ON NO COAL POWER PLANT IN SABAH
 

No comments:
Post a Comment